From dated to dream kitchen - cabinets, quartz, lighting, and layout.
Tops-off / in-progress for a short process strip
Built-in media wall with LED-lit niche - before, after, and night glow.
Finished unit with LED niche at night
Daytime finished unit with painted niche
Waterproofed pan to finished tile - niche, hex floor, and clean curb.
Classic subway tile tub surround
Walk-in shower and double vanity - tile, vanity, lighting, and wood-look floor. Jun-Aug 2023.
During: large-format tile going up in the new walk-in shower
AFTER: new vanity, toilet, lighting and wood-look tile floor
Double vanity with matching mirrors and new light bar
Unfinished to open family room, modern ceiling, and a dedicated office. Feb-Mar 2023.
Framing the new rooms and walls
Finished home office space, ready to move in
New lighting throughout - foyer chandelier, wagon-wheel fixture, and stair hall.
Compact half bath - vanity, mirror, and sconces, finished clean.
Vanity, mirror, sconces - clean finished half bath
Vaulted hall trim with French doors, transom, and crown detail.
Through French doors with transom
Transom and vaulted ceiling / crown
New hardwood through bedrooms, hall, and doorway transitions.
BEFORE: floors protected and ready for new hardwood
AFTER: rich hardwood floors through the living room
Hardwood plus new recessed lighting and fresh paint
Hardwood carried down the hallway
Finished hardwood, tall window
Grey LVP plank and a refreshed half bath for a rental turn.
Old deck out, full-width covered porch in - framing, roof, and composite decking. Sep-Oct 2022.
BEFORE: old back deck and porch roof
New framing for the full-width covered porch
Pressure-treated framing and new roof posts
AFTER: new composite decking under the covered porch
New railings, columns, and a fresh painted floor for the front entry. May-Jun 2022.
AFTER: new railings, columns, and painted porch floor
Framed, finished, and given a new bathroom - LVP floors, open-tread stairs, and a marble-look vanity. Oct 2023-Mar 2024.
BEFORE: basement framed for a new bathroom and rooms
AFTER: finished basement with LVP floors and open-tread stairs
New basement bathroom vanity with marble-look accent wall
Finished basement stairway with new treads and trim
From dated blue to a gutted rebuild with new tile, valve, and fixtures. Mar-May 2024.
BEFORE: dated blue bathroom
Gutted to the studs for a full remodel
Large-format tile and new shower valve going in
AFTER: new tub and shower, tile niche, hex floor and matte black fixtures
Rough stair to finished treads - framing and carpentry in progress.
Ground-up build - foundation walls, poured slab, and vaulted framing taking shape. May-Oct 2024.
Poured foundation, backfilled and leveled
Framing up: open, vaulted interior taking shape
Foundation trench and drain pipe run along the house.
Pipe in foundation trench
Long trench run along side of house